| 2015.1.14 |  French Ambassador Thierry DANA visited Fkushima Daiichi NPS (January 13, 2015) | 
												| 2014.12.19 |  State Minister of Economy, Trade and Industry Yosuke Takagi at Fukushima Daiichi Nuclear Power Station | 
												| 2014.5.1 |  External visual inspection results of the fuels removed from the spent fuel pool for Unit 4 at the Fukushima Daiichi Nuclear Power Station | 
												| 2014.4.15 |  IAEA (International Atomic Energy Agency) Visiting Fukushima Daiichi Nuclear Power Station on December 18, 2012 | 
												| 2014.3.11 |  Interview to the worker at Unit 4 building cover construction site at  Fukushima Daiichi NPS | 
							| 2014.3.11 |  Dr. Dale Klein's visit to Fukushima Daiichi NPS | 
												| 2014.1.30 |  Investigation into deformed fuel assemblies in the spent fuel pool at Unit 4 in Fukushima Daiichi Nuclear Power Station | 
							| 2014.1.30 |  Confirmation of cracks by investigation into deformed fuel assemblies in the spent fuel pool at Unit 4 in Fukushima Daiichi Nuclear Power Station | 
												| 2013.12.27 |  Cracks Found during Inspection on Fuel Assembly Having Deformation in Fukushima Daiichi NPS Unit 4 Spent Fuel Pool | 
												| 2013.12.18 |  Results of the Seventh Soundness Inspection for Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station | 
												| 2013.12.2 |  Extraction of Fuel from Unit 4 Spent Fuel Pool and Transfer to Common Pool | 
												| 2013.11.29 |  Fuel removal work at Fukushima Daiichi NPS Unit 4 (Cask transfer at common pool) | 
												| 2013.11.27 |  Fuel removal work (extraction of spent fuel) at Fukushima Daiichi NPS Unit 4 (video taken underwater) | 
												| 2013.11.26 |  Fuel removal work (extraction of spent fuel) at Fukushima Daiichi NPS Unit 4 | 
												| 2013.11.22 |  Fuel removal work at the common pool in Fukushima Daiichi NPS Unit 4 | 
												| 2013.11.21 |  Fuel removal work (cask transfer) at Fukushima Daiichi NPS Unit 4 | 
												| 2013.11.20 |  Extraction of fuel from Unit 4 (video taken underwater) | 
												| 2013.11.18 |  Current Status of Fukushima Daiichi NPS Unit 4 Fuel Removal | 
												| 2013.11.15 |  Operation of Fuel Removal from Unit 4 Spent Fuel Pool at Fukushima Daiichi NPS | 
												| 2013.11.13 |  Operation to Remove Spent Fuel from Unit 4 Spent Fuel Pool at Fukushima Daiichi NPS | 
												| 2013.11.1 |  The Same Type On-premise Transportation Container used for Fuel Debris from the Spent Fuel Pool at Unit 4 in Fukushima Daiichi NPS | 
												| 2013.10.30 |  Fuel Discharge from Reactor 4 Spent Fuel Pool in Fukushima Daiichi NPS | 
												| 2013.9.25 |  Progress Report on a Cover Installation for Fuel Removal at Unit 4 at Fukushima Daiichi NPS-Completion of Overhead Crane Installation- | 
												| 2013.8.28 |  Results of the Sixth Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station | 
												| 2013.8.9 |  Results of Inside Investigation of the Reactor Well, the RPV and the Spent Fuel Pool at Unit 4 in Fukushima Daiichi Nuclear Power Station | 
												| 2013.5.29 |  Completion of the Steel Frame Construction for the Cover to be Installed for Fuel Removal at Unit 4 at Fukushima Daiichi Nuclear Power Station | 
							| 2013.5.29 |  Results of the Fifth Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station | 
												| 2013.3.13 |  Steel Frame Construction for the Cover to be Installed for Fuel Removal at Unit 4 at Fukushima Daiichi Nuclear Power Station:Completion of the Third Layer of Steel Frame | 
												| 2013.2.13 |  Results of the Fourth Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station | 
												| 2013.2.1 |  Photos of the Accident at Fukushima Daiichi Nuclear Power Station (Publicized on February 1, 2013) | 
												| 2013.1.15 |  Steel Framing Construction for the Cover to be Installed for Fuel Removal at Unit 4 at Fukushima Daiichi Nuclear Power Station: Completion of the First Layer of Steel Framing | 
												| 2013.1.8 |  Steel Framing Construction for the Cover to be Installed for Fuel Removal at Unit 4 at Fukushima Daiichi Nuclear Power Station: Installation of 2 Columns of the First Layer | 
												| 2012.12.14 |  Puddle Found on the First Floor of Unit 4 Waste Treatment Building at Fukushima Daiichi Nuclear Power Station | 
												| 2012.12.3 |  National Academy of Science USA Visiting Fukushima Daiichi Nuclear Power Station | 
												| 2012.11.29 |  Results of the Third Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station | 
												| 2012.9.14 |  Removal work of the head of RPV at Unit 4 Fukushima Daini Nuclear Power Station | 
												| 2012.9.13 |  Removal of the RPV Lid in the Upper Part of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station | 
												| 2012.9.11 |  (40)Around the Unit 4 Reactor Building | 
							| 2012.9.11 |  (35)Unit 4 Instrument Air Compressor | 
							| 2012.9.11 |  (32)Unit 3 and 4 Ultraigh Voltage Switchyard Area (Inside) | 
							| 2012.9.11 |  (31)Unit 3 and 4 Ultraigh Voltage Switchyard Area (Outside) | 
							| 2012.9.11 |  (15)The Situation at Fukushima Daiichi Nuclear Power Station after the explosion of Unit 1,3 and 4. | 
							| 2012.9.11 |  (8)Appearance of Unit 3 after the explosion, and appearance of Unit 4 before the explosion viewed from Unit 3 | 
												| 2012.9.10 |  Current Condition of Fukushima Daiichi Nuclear Power Station | 
												| 2012.8.30 |  The Soundness of Unit 4 Reactor Building and Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station | 
							| 2012.8.30 |  Results of the Second Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station | 
												| 2012.8.29 |  Soundness Investigation of the Unused (Unirradiated) Fuel Removed from Unit 4 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station | 
												| 2012.8.28 |  Soundness Investigation of the Unused (Unirradiated) Fuel Removed from Unit 4 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station | 
												| 2012.8.14 |  Water Leakage in Unit 4 Turbine Building at Fukushima Daiichi Nuclear Power Station | 
												| 2012.8.10 |  Removal of PCV Lid from the Upper Part of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station | 
												| 2012.7.19 |  Unused Fuel Removal from Unit 4 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station | 
												| 2012.7.11 |  Completion of Debris Removal from the Upper Part of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station | 
												| 2012.7.6 |  Unit 4 Spent Fuel Pool Circulation Cooling System UPS Inside Inspection | 
												| 2012.6.26 |  Current Condition of Fukushima Daiichi Nuclear Power Station | 
												| 2012.6.15 |  The Protection Platform Installation on Unit 4 Spent Fuel Pool at Fukushima Daiichi Power Station | 
												| 2012.6.8 |  The Protection Platform Added on Unit 4 Spent Fuel Pool at Fukushima Daiichi Power Station | 
							| 2012.6.8 |  Motor Cable Connection for the Secondary System Circulation Pump (B) of Unit 4 Spent Fuel Pool Circulation Cooling System at Fukushima Daiichi Nuclear Power Station | 
												| 2012.6.5 |  Unit 4 Spent Fuel Pool Alternative Cooling System Secondary System Circulation Pump (A) Situation of the Burnt Area Near the Motor Terminal Housing | 
												| 2012.5.28 |  Fukushima Daiichi Nuclear Power Station Opened for an Observation (Minister of State for the Nuclear Power Policy and Administration Hosono observing Unit 4) No.2 | 
							| 2012.5.28 |  Fukushima Daiichi Nuclear Power Station Opened for an Observation (Minister of State for the Nuclear Power Policy and Administration Hosono observing Unit 4) No.1 | 
												| 2012.5.26 |  【Video】Fukushima Daiichi Nuclear Power Station Opened for an Observation (Minister of State for the Nuclear Power Policy and Administration Hosono observing Unit 4) | 
												| 2012.4.24 |  【Video】Visitation of Fukushima Daiichi Nuclear Power Station by Mr. Nakatsuka (Deputy Minister of Cabinet Office) | 
												| 2012.4.23 |  Fukushima Daiichi Nuclear Power Station Visitation of Mr. Nakatsuka, Senior Vice Minister of Cabinet Office | 
												| 2012.4.20 |  Treatment policy at an early stage during nitrogen gas separator (PSA-3,PSA-4) trouble time | 
												| 2012.4.16 |  General Plan and Start of Main Work of the Cover for Fuel Removal of Unit 4 in Fukushima Daiichi Nuclear Power Station | 
							| 2012.4.16 |  Set up of Manned Heavy Machinery on the upper side of Unit 4 Reactor Building In the Fukushima Daiichi Nuclear Power Station | 
												| 2012.3.22 |  Result of transparency investigation inside the spent fuel pool of Unit 4,  Fukushima Daiichi Nuclear Power Station | 
												| 2012.3.16 |  The Video for the Survey inside the Spent Fuel Pool of Unit 4, Fukushima Daiichi | 
												| 2012.3.12 |  Survey on Distribution of Debris in Unit 4 Spent Fuel Pool, Fukushima Daiichi Nuclear Power Station | 
												| 2012.3.6 |  Removal Works of Debris on the Upper Part of the Reactor Building of Unit 4 in Fukushima Daiichi Nuclear Power Station | 
												| 2012.3.2 |  Result of Visual Inspection of Inside of Primary Containment Vessels at Fukushima Daini Nuclear Power Station | 
												| 2012.2.10 |  Fukushima Daiichi Nuclear Power Station Start of marine soil coating construction inside the port | 
												| 2012.2.2 |  Situation of Water Leakage at First Floor in Reactor Building at Unit 4 of Fukushima Daiichi Nuclear Power Station | 
												| 2012.2.1 |  Status of Water Leakage on the 1st floor of Unit 4 Reactor Building, Fukushima Daiichi Nuclear Power Station (Test line of the Piping for Jet Pump Measurement) | 
												| 2012.1.26 |  Response training to abnormal conditions that occurred at Spent Fuel Pool per the Safety Regulation | 
												| 2012.1.20 |  Current Status of Fukushima Daiichi Nuclear Power Station by photographs | 
												| 2012.1.16 |  Scenery of obstacle removal by crane barge at intake cannel of Unit 1 to 4 | 
												| 2012.1.12 |  Status of inspection work of the main turbine of Unit 4 | 
												| 2012.1.8 |  Circulating Cooling System for Spent Fuel Pool of Unit 4 in Fukushima Daiichi Nuclear Power Station Leakage of Filtered Water from Cooling Pipe of Air Fin Cooler | 
												| 2011.12.17 |  Current view of Fukushima Daiichi Nuclear Power Plant | 
												| 2011.11.29 |  Resumption of desalting by ion exchanging device at spent fuel pool of Unit4 at Fukushima Daiichi Nuclear Power Plant | 
												| 2011.11.10 |  Survey result of damages to air-conditioning ducts etc. in the Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station | 
												| 2011.11.9 |  Liquid leakage in the desalting facility for the spent fuel pool in Unit 4 of Fukushima Daiichi Nuclear Power Station | 
												| 2011.11.2 |  Overview of the blocking operation of the units 1 - 4 openings | 
												| 2011.10.8 |  Status of Fukushima Daiichi Nuclear Power Plants shown in photos | 
												| 2011.9.27 |  Picture of mock-up test for covering Spent Fuel Pool to remove debris on the roof of Reactor Building at Unit 4, Fukushima Daiichi Nuclear Power Station | 
												| 2011.9.17 |  Fukushima Daiichi Nuclear Power Plant Photo Collection | 
												| 2011.9.9 |  Current situation of outdoor water exposure Fukushima Daiichi Nuclear Power Station | 
												| 2011.8.30 |  Unit 4, Fukushima Daini Nuclear Power Station Accumulated water in Primary Containment Vessel | 
												| 2011.8.20 |  Desalting Facilities for Spent Fuel Pool at Unit 4, Fukushima Daiichi Nuclear Power Station | 
												| 2011.7.30 |  Completion of Installation of Supporting Structure under the Bottom of the Spent Fuel Pool in the Reactor Building at Fukushima Daiichi Nuclear Power Station Unit 4 | 
												| 2011.7.6 |  Fuel Pool Cooling and Filtering System Valve of Unit 4, Fukushima Daiichi Nuclear Power Station | 
												| 2011.7.1 |  Spent Fuel Pool in Reactor Building , Unit 4, Fukushima Daiichi Nuclear Power Station | 
												| 2011.6.30 |  Results of Investigation on 5th Floor of the Reactor Building Unit 4 | 
												| 2011.6.20 |  Installation work of supporting structure at the bottom of Spent Fuel Pool | 
												| 2011.6.11 |  Pictured at South Side on 4th floor of Unit 4 Reactor Building | 
												| 2011.6.8 |  Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station Installation of support pillars at the bottom of the Spent Fuel Poo | 
												| 2011.5.29 |  Inside the Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station | 
												| 2011.5.17 |  Fukushima Daiichi Nuclear Power Station Current status of restoration work | 
												| 2011.5.8 |  Status of the Spent Fuel Pool of Unit 4 of Fukushima Daiichi Nuclear Power Station | 
												| 2011.4.29 |  The spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station | 
												| 2011.4.28 |  Robot, Truck etc. | 
												| 2011.4.16 |  Movies taken from T-Hawk, Reactor Building, Unit 1, 3,4 Fukushima Daiichi Nuclear Power Station | 
												| 2011.4.15 |  Sampling of water in the spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station | 
												| 2011.4.12 |  Fukushima Daiichi Nuclear Power Station(When fire was detected, After initial extinction, Before installing steel water bars, Sampling of water from the spent fuel pool) | 
												| 2011.4.11 |  Motion pictures of Fukushima Daiichi Nuclear Power Station | 
												| 2011.4.1 |  Water pumping using a concrete pumping car for Unit 4 of Fukushima Daiichi Nuclear Power Station | 
												| 2011.3.29 |  Control room for Unit 4 of Fukushima Daiichi Nuclear Power Station | 
												| 2011.3.23 |  Control room of Fukushima Daiichi Nuclear Power Station | 
												| 2011.3.22 |  Water pumping using a concrete pumping car | 
												| 2011.3.17 |  Unit 3,Uniit4 of Fukushima Daiichi Nuclear Power Station (pictured from a helicopter) | 
												| 2011.3.16 |  Unit 1 - 4 of Fukushima Daiichi Nuclear Power Station |