Motor Cable Connection for the Secondary System Circulation Pump (B) of Unit 4 Spent Fuel Pool Circulation Cooling System at Fukushima Daiichi Nuclear Power Station
Upload dateJune 8, 2012
Photo
Before the connection was fixed
(Photo taken on June 5, 2012 by TEPCO)
After the connection was fixed
(Photo taken on June 6, 2012 by TEPCO)
Category
■Search by status/measures
Others
■Pickup
Troubles in water processing system