Work

Upload dates
Title
2020.9.15 Secondary Treatment Performance Confirmation Tests on ALPS-treated water at the Fukushima Daiichi Nuclear Power Station
2020.8.3 Unit 3 fuel removal work at the Fukushima Daiichi Nuclear Power Station
2020.6.11 Completion of the Internal Investigation of the Unit 2 Spent Fuel Pool (SFP) at the Fukushima Daiichi Nuclear Power Station
2020.6.11 Completion of air mortar injection into the Fukushima Daiichi Nuclear Power Station Unit 1 SFP cover bag
2020.6.10 Start of Internal Investigation of the Fukushima Daiichi Nuclear Power Station Unit 2 Spent Fuel Pool (SFP)
2020.5.13 Submersible ROV Operation Training in Preparation for the Unit 2 Spent Fuel Pool Internal Investigation at the Fukushima Daiichi Nuclear Power Station
2020.5.1 Completion of the Unit 1/2 exhaust stack dismantling at the Fukushima Daiichi Nuclear Power Station
2020.4.29 Dismantling of the Unit 1/2 exhaust stack 23rd block at the Fukushima Daiichi Nuclear Power Station
2019.12.4 Dismantling of the Unit 1/2 exhaust stack at the Fukushima Daiichi Nuclear Power Station (work on December 4)
2019.12.4 Dismantling of the Unit 1/2 exhaust stack at the Fukushima Daiichi Nuclear Power Station (work on December 3)
2018.5.28 Wall Dismantling Work to create an Opening in the West Wall of Unit 2 Reactor Building
2018.2.21 Installation of all Dome Roof Segments for Unit 3 Spent Fuel Removal Completed
2017.11.20 Installation of the crane for fuel removal at Fukushima Daiichi NPS Unit 3
2017.11.12 Installation of the fuel handling machine for fuel removal at Fukushima Daiichi NPS Unit 3
2017.11.9 Fuel handling machine and crane installation for Unit 3 spent fuel removal
2017.9.7 Installation of Unit 3 spent fuel removal cover dome roof at Fukushima Daiichi Nuclear Power Station (Second unit)
2017.8.22 Phase 3 freezing of Landside Impermeable Wall starts at Fukushima Daiichi Nuclear Power Station
2017.8.2 Installation of Unit 3 spent fuel removal cover dome roof at Fukushima Daiichi Nuclear Power Station (On-site demonstration)
2017.7.31 Installation of Unit 3 fuel removal cover dome roof at Fukushima Daiichi Nuclear Power Station (First unit)
2017.6.27 Installation of the cover for Unit 3 spent fuel removal at Fukushima Daiichi Nuclear Power Station
2017.3.2 Construction of a steel frame to support fuel handling machine began during the new roof installation for Unit 3 spent fuel removal
2017.1.17 Construction of a new roof for Unit 3 spent fuel removal began at Fukushima Daiichi Nuclear Power Station
2016.12.26 Completion of drilling a hole toward investigation inside Unit 2 Primary Containment Vessel (PCV) at Fukushima Daiichi Nuclear Power Station
2016.12.24 Completion of drilling a hole toward investigation inside Unit 2 Primary Containment Vessel (PCV) at Fukushima Daiichi Nuclear Power Station
2016.11.10 Removal of all wall panels (18 in total) from the Unit 1 reactor building cover completed at Fukushima Daiichi Nuclear Power Station
2016.10.20 Examination of the Interior of Units 1 and 2 Exhaust Stack Using Drones at Fukushima Daiichi Nuclear Power Station
2016.10.7 Removal of the 8th wall panel over Unit 1 reactor building at Fukushima Daiichi Nuclear Power Station
2016.9.21 Conditions of the bank protection area at Fukushima Daiichi Nuclear Power Station (2)
2016.9.21 Conditions of the bank protection area at Fukushima Daiichi Nuclear Power Station
2016.9.13 First Wall Panel Removal from Unit 1 Building Cover at Fukushima Daiichi Nuclear Power Station
2016.9.9 Water level measurement in the drain sump pit of Units 1-2 exhaust stack at Fukushima Daiichi Nuclear Power Station
2016.9.5 Progress of on-site preparation work (opening of the pit cover) to examine the drain sump pit of Units 1-2 exhaust stack at Fukushima Daiichi Nuclear Power Station
2016.8.26 Start of on-site preparation work (opening of the pit cover) to examine the drain sump pit of Units 1-2 exhaust stack at Fukushima Daiichi Nuclear Power Station
2016.6.6 Phase 2 freezing of Landside Impermeable Wall starts at Fukushima Daiichi Nuclear Power Station
2016.4.12 Shielding Installation on the Top Floor of Unit 3 Reactor Building
2016.4.7 A Week After the Official Activation of Landside Impermeable Wall (frozen soil wall, or "ice wall")
2016.4.6 Start of Nozzle Unit Installations for Mist Sprinkler Associated with the Dismantling of Unit 1 Reactor Building Cover
2016.3.31 Freezing Started for the Landside Impermeable Wall at Fukushima Daiichi Nuclear Power Station
2016.2.23 Decontamination Work Conducted by the Dry Ice Blast Decontamination Equipent for High Places
2015.10.29 Completion of Dismantling Flange Tanks in the H1 East Tank Area at Fukushima Daiichi Nuclear Power Station
2015.10.26 Completion of Seaside Impermeable Wall Closure at Fukushima Daiichi Nuclear Power Station
2015.10.6 Completion of Roof Panel Removal from Unit 1 Building Cover at Fukushima Daiichi Nuclear Power Station
2015.9.15 Completion of Pouring the Brine on the Landside of the Landside Impermeable Wall (Ice Wall)
2015.9.14 Operational Start of Discharging Groundwater from a Temporary Water Storage Tank through the Subdrain Water Treatment Facilities
2015.9.10 Closing Operation of the Seaside Impermeable Wall at Fukushima Daiichi Nuclear Power Station
2015.8.27 Filling Up Inside Unit 3 Seawater Piping Trench At Fukushima Daiichi Nuclear Power Station
2015.8.4 (2015.8.6 video added) Investigation Results Inside of the Unit 3 Spent Fuel Pool
2015.8.2 Completion of removal of Fuel Handling Machine from Fukushima Daiichi Unit 3 Spent Fuel Pool
2015.5.27 Operational Start of Dismantling the H2 area tank at Fukushima Daiichi Nuclear Power Station
2015.5.15 Start Dismantling Unit 1 Reactor Building Cover <Start Sprinkling Anti-scattering Agent>
2015.4.28 Coolant Functioning Test of Land-side Impermeable Wall (Frozen Soil Wall)
2015.2.27 Completion of Unit 3 Reactor Opening at Fukushima Daini Nuclear Power Station
2015.2.9 Unit 3 Trench-Filling operation
2015.2.9 Development for fuel debris detection technology for reactor at Fukushima Daiichi Nuclear Power Station (Unit 1)
2014.12.4 Restoring roof panels for the demolition of Unit 1 reactor building cover at Fukushima Daiichi NPS
2014.11.10 Removing the roof panels of Unit 1 reactor building cover (the 2nd panel)
2014.10.31 Removing the roof panels of Unit 1 reactor building cover (the south 3 roof panel)
2014.10.28 Enlarged Opening on the Roof Panels at the Demolition Work of Unit 1 Reactor Building Cover
2014.10.22 Dismantling of Unit 1 reactor building cover
2014.9.30 About the completion of the countermeasure work to address the downward flow of strontium present in the soil in relation to the leak in H4 area tank
2014.7.17 Replacing Drainage Channel Outlet to the Port For Drainage B and C
2014.6.12 Started building of frozen wall (Ice wall)
2014.5.21 Groundwater bypass at Fukushima Daiichi Nuclear Power Station (water discharge)
2014.4.17 Pictures of Installation/ Draining of Ready-Made Contaminated Water Storage Tanks at Fukushima Daiichi NPS
2014.4.9 Start of pump-up work for beginning the operation of groundwater bypass at Fukushima Daiichi Nuclear Power Station
2013.12.27 Tank installation, measures against rainwater, and work to have drainage channels covered, at Fukushima Daiichi NPS (Video)
2013.11.29 Fuel removal work at Fukushima Daiichi NPS Unit 4 (Cask transfer at common pool)
2013.11.27 Decontamination work on the first floor at Unit 2 reactor building in Fukushima Daiichi NPS
2013.11.27 Fuel removal work (extraction of spent fuel) at Fukushima Daiichi NPS Unit 4 (video taken underwater)
2013.11.26 Fuel removal work (extraction of spent fuel) at Fukushima Daiichi NPS Unit 4
2013.11.22 Fuel removal work at the common pool in Fukushima Daiichi NPS Unit 4
2013.11.21 Fuel removal work (cask transfer) at Fukushima Daiichi NPS Unit 4
2013.11.20 Extraction of fuel from Unit 4 (video taken underwater)
2013.11.18 Current Status of Fukushima Daiichi NPS Unit 4 Fuel Removal
2013.11.15 Operation of Fuel Removal from Unit 4 Spent Fuel Pool at Fukushima Daiichi NPS
2013.11.13 Operation to Remove Spent Fuel from Unit 4 Spent Fuel Pool at Fukushima Daiichi NPS
2013.10.25 Precautionary Measures of Accumulated Water inside the Dike against Typhoon No.27 (Francisco) at Fukushima Daiichi NPS
2013.10.17 Completion of fuel transfer at Unit 2 in Fukushima Daini Nuclear Power Station
2013.10.16 Pumping up of rainwater inside the dike in reaction to the approaching Typhoon No. 26 (Wipha)
2013.9.25 Progress Report on a Cover Installation for Fuel Removal at Unit 4 at Fukushima Daiichi NPS-Completion of Overhead Crane Installation-
2013.9.19 Work Progress in Dismantlement of the Tank No.5 in H4 Tank Area
2013.9.18 Dismantlement of the Tanks No. 10 and No.5 in H4 Tank Area
2013.9.13 Dismantlement of the tank No.10 in H4 tank area
2013.9.10 Unit 3 Reactor Building, at Fukushima Daiichi Nuclear Power Station, The Bent-Down Tip Jib Mast and Main Mast of a Remote Control Large-Scale Crane
2013.9.2 Results of Tank Patrol at Fukushima Daiichi Nuclear Power Station
2013.8.26 Removal of Obstacles Including Debris, etc., at the Southwest Side on the First Floor of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.8.15 Installation of Permanent Monitoring Instrument of Unit 2 PCV at Fukushima Daiichi Nuclear Power Station
2013.8.15 Commencement of Pumping up of Groundwater from the Well Point (Partial) between the Water Intake Channel of Unit 1 and 2 at Fukushima Daiichi Nuclear Power Station
2013.8.9 Condition of Radioactive Density of the Groundwater and the Seawater at the East Side of Turbine Buildings
2013.7.22 Completion of Outer Wall and Exterior Roof Panel Installation for the Fuel Removal Cover at Unit 4 in Fukushima Daiichi Nuclear Power Station
2013.7.17 Ground Improvement Construction (Chemical Injection) at Bank Protection between the Water Intake Channel of Unit 1 and Unit 2 at Fukushima Daiichi Nuclear Power Station(Video taken on July 6, 2013)
2013.7.12 Current status of Fukushima Daini Nuclear Power Station (July 2013)
2013.7.9 Ground Improvement Construction (Chemical Injection) at Bank Protection between the Water Intake Channel of Unit 1 and Unit 2 at Fukushima Daiichi Nuclear Power Station
2013.6.28 Foundation Concrete Placing Work Started at the Miscellaneous Solid Waste Incineration Building
2013.4.26 Removal of the Guide Pipe (Used for PCV Inside Investigation) from Unit 2 PCV at Fukushima Daiichi Nuclear Power Station
2013.4.22 Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.4.11 Progress of the Steel Frame Construction for the Cover to be Installed for Fuel Removal at Unit 4 at Fukushima Daiichi Nuclear Power Station
2013.4.4 Transportation of a Dry Storage Cask from the Common Pool Building to the Temporary Dry Cask Storage Facility in Fukushima Daiichi Nuclear Power Station
2013.3.26 Hole Drilling for the Investigation of Unit 2 Torus Room at Fukushima Daiichi Nuclear Power Station
2013.3.13 Steel Frame Construction for the Cover to be Installed for Fuel Removal at Unit 4 at Fukushima Daiichi Nuclear Power Station:Completion of the Third Layer of Steel Frame
2013.3.4 Completion of Water Stop Work at the Location Where Water Inflow into Unit 3 Radioactive Waste Underground Storage Facility Building was Found at Fukushima Daiichi Nuclear Power Station
2013.2.6 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: January 2013)
2013.2.6 Debris Removal from the Upper part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station: Removal of Steel Truss Debris
2013.2.1 Photos of the Accident at Fukushima Daiichi Nuclear Power Station (Publicized on February 1, 2013)
2013.1.15 Steel Framing Construction for the Cover to be Installed for Fuel Removal at Unit 4 at Fukushima Daiichi Nuclear Power Station: Completion of the First Layer of Steel Framing
2013.1.9 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: December 2012)
2013.1.8 Steel Framing Construction for the Cover to be Installed for Fuel Removal at Unit 4 at Fukushima Daiichi Nuclear Power Station: Installation of 2 Columns of the First Layer
2012.12.20 Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station: Removal of the Steel Beam Which Fell into the Pool
2012.12.19 Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station: Removal of the Steel Beam Which Fell into the Pool
2012.12.5 Completion of Water Stop Work at Unit 3 Control Building at Fukushima Daiichi Nuclear Power Station
2012.12.5 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: November 2012)
2012.11.2 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: October 2012)
2012.10.15 Duct Replacement at Unit 2 PCV Gas Control System at Fukushima Daiichi Nuclear Power Station
2012.10.3 Unit 2 RPV Alternative Thermometer Installation at Fukushima Daiichi Nuclear Power Station
2012.10.2 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: September 2012)
2012.9.14 Removal work of the head of RPV at Unit 4 Fukushima Daini Nuclear Power Station
2012.9.13 Removal of the RPV Lid in the Upper Part of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
2012.9.10 Damage of Unit 2 PCV Gas Control System Duct at Fukushima Daiichi Nuclear Power Station
2012.9.10 Current Condition of Fukushima Daiichi Nuclear Power Station
2012.9.10 Opening Unit 4 Reactor at Fukushima Daini Nuclear Power Station
2012.8.10 Removal of PCV Lid from the Upper Part of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
2012.8.9 Reliability Improvement of the Second Cesium Absorption Apparatus
2012.7.19 Unused Fuel Removal from Unit 4 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station
2012.7.18 Progress Status of Covering the Marine Soil of the Port of Fukushima Daiichi Nuclear Power Station
2012.7.11 Completion of Debris Removal from the Upper Part of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
2012.6.26 Current Condition of Fukushima Daiichi Nuclear Power Station
2012.6.15 The Protection Platform Installation on Unit 4 Spent Fuel Pool at Fukushima Daiichi Power Station
2012.6.12 Reliability Enhancement Work for the Cesium Absorption Apparatus
2012.5.16 Progress Status of Covering the Marine Soil of the Port of Fukushima Daiichi Nuclear Power Station
2012.4.26 Regarding the treatment of certain areas of the Seismic isolated building of the Fukushima Daiichi Nuclear Power Station as “Uncontrolled area”
2012.4.16 General Plan and Start of Main Work of the Cover for Fuel Removal of Unit 4 in Fukushima Daiichi Nuclear Power Station
2012.4.16 Set up of Manned Heavy Machinery on the upper side of Unit 4 Reactor Building In the Fukushima Daiichi Nuclear Power Station
2012.3.27 Dose measurement work inside of the primary containment vessels of unit 2 of Fukushima Daiichi NPS
2012.3.13 Ocean soil covering work in front of the intake channel of Fukushima Daiichi Nuclear Power Station Situation of the field test construction and covering condition
2012.3.6 Removal Works of Debris on the Upper Part of the Reactor Building of Unit 4 in Fukushima Daiichi Nuclear Power Station
2012.2.21 Fukushima Daiichi Nuclear Power Plant Start of marine soil coating construction inside the port
2012.2.3 Radiation dose reduction by collecting dust and small rubbles at the parking lot in front of Main Anti-Earthquake Building of Fukushima Daiichi Nuclear Power Station
2012.2.1 Measures against Freeze of Water Treatment Facility / Measures against Freeze of Reactor Water Injection System at Fukushima Daiichi Nuclear Power Station
2012.1.20 Current Status of Fukushima Daiichi Nuclear Power Station by photographs
2012.1.16 Scenery of obstacle removal by crane barge at intake cannel of Unit 1 to 4
2011.12.17 Current view of Fukushima Daiichi Nuclear Power Plant
2011.11.30 Establishment of New Routes for Nitrogen Injection into RPV at Units 1-3 of Fukushima Daiichi Nuclear Power Station
2011.11.29 Resumption of desalting by ion exchanging device at spent fuel pool of Unit4 at Fukushima Daiichi Nuclear Power Plant
2011.11.22 Unit 3, Fukushima Daiichi Nuclear Power Station Wiping work of rails for the equipment hatch, the Pressure Containment Vessel
2011.11.19 Debris removal works with heavy machinery at Fukushima Daiichi Nuclear Power
2011.11.16 Survey and Cleaning in Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2011.11.7 Installation Status of Radioactive Material Removal Facility at the Unit 2's Spent Fuel Pool of Fukushima Daiichi Nuclear Power Station
2011.11.5 Obstacle Removal by Robot and Radiation Dose Measurement after the Removal on the First Floor of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2011.11.2 Overview of the blocking operation of the units 1 - 4 openings
2011.10.28 Ancillary facilities for cover panels of Unit 1(Completion of Cover Construction at Reactor Building of Unit 1 of Fukushima Daiichi NPS)
2011.10.15 Current Situation of Fukushima Daiichi Nuclear Power Plant in Pictures -J Village Edition
2011.10.14 Completion of installing the roof panel of the cover for the reactor building at Unit 1
2011.10.11 Overview of dust sampling at the openings of Unit 1 Reactor Building in Fukushima Daiichi Nuclear Power Station
2011.10.10 1st floor of Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station Cutoff operation for a spray system pipe of RPV
2011.10.10 1st floor of Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station Cutoff operation for a spray system pipe of RPV
2011.10.8 Installation Work of Roof Panels for Reactor Building Covers at Unit 1 of Fukushima Daiichi Nuclear Power Plant
2011.10.8 Status of Fukushima Daiichi Nuclear Power Plants shown in photos
2011.10.7 View of spraying water after purification of accumulated water at Unit 5 and 6 of Fukushima Daiichi Nuclear Power Station on site
2011.10.1 Overview of Dust Collector System
2011.9.27 Picture of mock-up test for covering Spent Fuel Pool to remove debris on the roof of Reactor Building at Unit 4, Fukushima Daiichi Nuclear Power Station
2011.9.17 Fukushima Daiichi Nuclear Power Plant Photo Collection
2011.9.8 Enhancement of medical services at Fukushima Daiichi NPS
2011.8.17 Reporting from the grounds of Fukushima Daiichi Nuclear Power Station
2011.8.10 Status of iron frame construction for the reactor building cover of Unit 1 at Fukushima Daiichi Nuclear Power Station
2011.7.31 Air leakage at Main Exhaust Stack of Unit 4, Fukushima Daini Nuclear Power Station
2011.7.30 Completion of Installation of Supporting Structure under the Bottom of the Spent Fuel Pool in the Reactor Building at Fukushima Daiichi Nuclear Power Station Unit 4
2011.7.28 Video by Quince Robot within Fukushima Daiichi Nuclear Power Station Unit 3 reactor building
2011.7.27 Fukushima Daiichi Nuclear Power Station Reactor Building of Unit3 Site Investigation by Quince
2011.7.26 Installation of reactor building cover Unit 1, Fukushima Daiichi Nuclear Power Station
2011.7.26 The 2nd Cesium Adsorption Facility (SARRY)
2011.7.18 Fukushima Daiichi Nuclear Power Station Unit 3 Turbine Building Installation Work of Roof
2011.7.17 Appearance of the Roof for Countermeasure against Rainwater, Unit 3, Fukushima Daiichi
2011.7.12 The repaired part for chemical leakage of water treatment system(before/after repair)
2011.7.10 The repaired part for chemical leakage of water treatment system (coagulation settling facility)
2011.7.9 Fukushima Daiichi Unit3 - Investigation result of nitrogen injection point at R/B
2011.7.7 Trial fitting of the cover for Unit 1, Fukushima Daiichi Nuclear Power Station at Onahama port
2011.7.5 Construction Status of Mitigation of Contamination in the Ocean from Unit 1 to 4(Water intake sliding concrete plate in the screen)
2011.7.4 Fukushima Daiichi Nuclear Power Plant Setting steel sheet at the 1st floor of the unit 3 reactor building
2011.7.2 Cleanup work by using a robot in Unit 3 Reactor Building at Fukushima Daiichi Power Station
2011.6.30 Cleaning system for Unit 3, Fukushima Daiichi Nuclear Power Station
2011.6.30 Removal of Heavy Oil Tank No.1 at Fukushima Daiichi Nuclear Power Station
2011.6.23 Temporary Indicator Set-up at Unit 2
2011.6.20 Installation work of supporting structure at the bottom of Spent Fuel Pool
2011.6.10 Transportation of large tank to Fukushima Daiichi Nuclear Power Station
2011.6.8 Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station Installation of support pillars at the bottom of the Spent Fuel Poo
2011.6.5 Spraying dust inhibitor over outside walls and roofs of Fukushima Daiichi Nuclear Power Station
2011.6.4 Fukushima Daiichi Nuclear Power Station Temporary reactor pressure indicators
2011.5.28 Spraying dust inhibitor at Fukushima Daiichi Nuclear Power Station
2011.5.17 Fukushima Daiichi Nuclear Power Station Current status of restoration work
2011.4.28 Fukushima Daiichi Nuclear Power Station
2011.4.11 Motion pictures of Fukushima Daiichi Nuclear Power Station
2011.4.11 Removal of Rubbles by Remotely Controlled Heavy Machinery (System 1)
2011.3.23 Grid line connection work to offsite power grid
2011.3.22 Water pumping using a concrete pumping car