Commencement of Pumping up of Groundwater from the Well Point (Partial) between the Water Intake Channel of Unit 1 and 2 at Fukushima Daiichi Nuclear Power Station
Upload dateAugust 15, 2013
![](/library/130815_01/130815_01.jpg)
Photo
![](/library/130815_01/130815_01t.jpg)
![](/library/130815_01/130815_02t.jpg)
Connection of water collecting pipe
Photo taken on August 15, 2013
Photo taken on August 15, 2013
![](/library/130815_01/130815_03t.jpg)
Installation of water collecting pipe
Photo taken on August 15, 2013
Photo taken on August 15, 2013
![](/library/130815_01/130815_04t.jpg)
Installation of suction pipe
Photo taken on August 14, 2013
Photo taken by Tokyo Electric Power Company
Video
Category
■Search by status/measures
Mitigation of radioactive materials / Work