Ocean soil covering work in front of the intake channel of Fukushima Daiichi Nuclear Power Station Situation of the field test construction and covering condition
Upload dateMar 13, 2012
![](/library/120213/120313_01.jpg)
Photo
![](/library/120213/120313_01_t.jpg)
(1)Situation of the field test construction in front of the intake channel of Unit 1-4
pictured on February 28, 2012
![](/library/120213/120313_02_t.jpg)
(2)Seafloor condition before covering
pictured on February 6, 2012
![](/library/120213/120313_03_t.jpg)
(3)Seafloor condition after 1st layer covering
pictured on February 29, 2012
![](/library/120213/120313_04_t.jpg)
(4)Seafloor condition after 2nd layer covering
pictured on March 10, 2012