Ocean soil covering work in front of the intake channel of Fukushima Daiichi Nuclear Power Station Situation of the field test construction and covering condition
Upload dateMar 13, 2012
Photo
(1)Situation of the field test construction in front of the intake channel of Unit 1-4
pictured on February 28, 2012
(2)Seafloor condition before covering
pictured on February 6, 2012
(3)Seafloor condition after 1st layer covering
pictured on February 29, 2012
(4)Seafloor condition after 2nd layer covering
pictured on March 10, 2012
Category
■Search by status/measures
Mitigation of radioactive materials / Work