Dismantlement of the Tanks No. 10 and No.5 in H4 Tank Area
Upload dateSeptember 18, 2013

Photo

No.10 Completion of the side plate removal (3rd layer)
Photo taken on September 14, 2013
Photo taken on September 14, 2013

No.10 Completion of the side plate removal (1st layer)
Photo taken on September 16, 2013
Photo taken on September 16, 2013

No.10 Completion of reinforcement for the bottom plate
Photo taken on September 16, 2013
Photo taken on September 16, 2013

No.5 Top plate removal
Photo taken on September 17, 2013
Photo taken on September 17, 2013

No.10 Joint between the side plate (1st layer) and the bottom plate (inside)
Photo taken on September 15, 2013
Photo taken on September 15, 2013

No.10 Gathering of rust at a side plate
Photo taken on September 15, 2013
Photo taken on September 15, 2013

No.10 Sealed part
Photo taken on September 15, 2013
Photo taken on September 15, 2013

No.5 Completion of the side plate removal (3rd layer)
Photo taken on September 18, 2013
Photo taken by Tokyo Electric Power Company