Current status of Fukushima Daini Nuclear Power Station (July 2013)
Upload dateJuly 12, 2013
Photo
Fuel transfer (from the reactor to the spent fuel pool)
Fuel removal from the reactor
[ photo of the fuel transfer of Unit 4 ]
(Photo taken on October 1, 2012)
Fuel removal from the reactor
[ photo of the fuel transfer of Unit 4 ]
(Photo taken on October 1, 2012)
On-site investigation by the "Reactor Decommissioning Safety Monitoring Commission"
Prior explanation by TEPCO
Prior explanation by TEPCO
Emergency diesel generator (diesel engine)
(in the 2nd basement of the Reactor Building Annex)
(in the 2nd basement of the Reactor Building Annex)
Emergency diesel generator (generator)
(in the 2nd basement of the Reactor Building Annex)
(in the 2nd basement of the Reactor Building Annex)
Residual Heat Removal equipment cooling system pump
(on the 1st floor of the Seawater Heat Exchanger Building)
Photo taken by Tokyo Electric Power Company
Links
<Reference>
Current status of Fukushima Daini Nuclear Power Station (July 2013) (PDF 338KB)
Current status of Fukushima Daini Nuclear Power Station (July 2013) (PDF 338KB)
Category
■Search by status/measures
Work / Others