Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: October 2012)
![](/library/20121102_0101/121102_01.jpg)
![](/library/20121102_0101/121102_01t.jpg)
Power panel being lifted up by a crane car
Photo taken on October 24, 2012
![](/library/20121102_0101/121102_02t.jpg)
Power panel being carried into the building
Photo taken on October 24, 2012
![](/library/20121102_0101/121102_03t.jpg)
Power panel (M/C 1HPCS) being carried into the building (Carry-in completed on October 24)
Photo taken on October 24, 2012
![](/library/20121102_0101/121102_04t.jpg)
Functional check (Completed on October 29, 2012)
Photo taken on October 29, 2012
![](/library/20121102_0101/121102_05t.jpg)
Control panel installation (Completed on October 1, 2012)
Photo taken on October 19, 2012
![](/library/20121102_0101/121102_08t.jpg)
Generator stator being lifted up by a crane car
Photo taken on October 15, 2012
![](/library/20121102_0101/121102_07t.jpg)
Generator stator being carried into the building [Carry-in completed on October 15, 2012]
Photo taken on October 15, 2012
![](/library/20121102_0101/121102_06t.jpg)
Generator rotor being lifted up by a crane car
Photo taken on October 18, 2012
![](/library/20121102_0101/121102_09t.jpg)
Generator rotor being carried into the building [Carry-in completed on October 18, 2012]
Photo taken on October 18, 2012
![](/library/20121102_0101/121102_10t.jpg)
Photo taken on October 29, 2012
![](/library/20121102_0101/121102_11t.jpg)
Power panel being lifted up by a crane car
Photo taken on October 16, 2012
![](/library/20121102_0101/121102_12t.jpg)
Photo taken on October 16, 2012
![](/library/20121102_0101/121102_13t.jpg)
Power panel (P/C 2D-2) installation completed on October 29, 2012
Photo taken on October 29, 2012
![](/library/20121102_0101/121102_15t.jpg)
Reactor coolant purification system purge line connected with a temporary hose
Photo taken on July 6, 2012
![](/library/20121102_0101/121102_16t.jpg)
Reactor coolant purification system purge line connected with a temporary hose (Enlarged image)
Photo taken on July 6, 2012
![](/library/20121102_0101/121102_17t.jpg)
Photo taken on October 29, 2012
![](/library/20121102_0102/121102_18t.jpg)
Unit 4 Reactor Building 6th floor
Photo taken on October 23, 2012
![](/library/20121102_0102/121102_19t.jpg)
Hanging the fuel grab machine down into the reactor
Photo taken on October 23, 2012
![](/library/20121102_0102/121102_20t.jpg)
Fuel assembly being taken out (1)
Photo taken on October 22, 2012
![](/library/20121102_0102/121102_21t.jpg)
Fuel assembly being taken out (2)
Photo taken on October 22, 2012
![](/library/20121102_0102/121102_22t.jpg)
Fuel assembly being moved into the spent fuel pool (1)
Photo taken on October 22, 2012
![](/library/20121102_0102/121102_23t.jpg)
Fuel assembly being moved into the spent fuel pool (2)
Photo taken on October 23, 2012
![](/library/20121102_0102/121102_24t.jpg)
Fuel assembly being inserted into the spent fuel rack (1)
Photo taken on October 22, 2012
![](/library/20121102_0102/121102_25t.jpg)
Fuel assembly being inserted into the spent fuel rack (2)
Photo taken on October 22, 2012
Photo taken by Tokyo Electric Power Company
Moving the fuel at Unit 4 at Fukushima Daini Nuclear Power Station (8:19)
Play Video / Download(59.1MB)
Category
■Search by status/measures
Work / Others