Installation Status of Radioactive Material Removal Facility at the Unit 2's Spent Fuel Pool of Fukushima Daiichi Nuclear Power Station
Upload dateNov 07,2011
![](/library/111107/111107_01.jpg)
Photo
![](/library/111107/111107_01t.jpg)
Entire Picture of the Trailer (carrying the Adsorption Tower)
pictured on Nov 06,2011
pictured on Nov 06,2011
![](/library/111107/111107_02.jpg)
Main Body of Cesium Adsorption Tower
pictured on Nov 06,2011
pictured on Nov 06,2011
![](/library/111107/111107_03.jpg)
Truck (Valve Unit)
pictured on Nov 06,2011
pictured on Nov 06,2011
Category
■Search by status/measures
Work