Work Progress in Dismantlement of the Tank No.5 in H4 Tank Area
Upload dateSeptember 19, 2013
Photo
The tank No.5 in H4 area Completion of the side plates removal (2nd layer)
Photo taken on September 18, 2013
Photo taken on September 18, 2013
The tank No.5 in H4 area The bottom plates (with protection materials)
Photo taken on September 19, 2013