The Protection Platform Added on Unit 4 Spent Fuel Pool at Fukushima Daiichi Power Station
Upload dateJune 8, 2012
![Protection float covering the spent fuel pool (Current condition) Protection float covering the spent fuel pool (Current condition)](/library/120608_01/120608_01.jpg)
Photo
![Protection float covering the spent fuel pool (Current condition) Protection float covering the spent fuel pool (Current condition)](/library/120608_01/120608_01_t.jpg)
Protection float covering the spent fuel pool (Current condition)
(Photo taken on May 22, 2012 by TEPCO)
(Photo taken on May 22, 2012 by TEPCO)
![Protection platform for the spent fuel pool (Assembled on the ground) Protection platform for the spent fuel pool (Assembled on the ground)](/library/120608_01/120608_02_t.jpg)
Protection platform for the spent fuel pool (Assembled on the ground)
(Photo taken on June 4, 2012 by TEPCO)
(Photo taken on June 4, 2012 by TEPCO)
Category
■Search by status/measures
Others