Results of Investigation on 5th Floor of the Reactor Building Unit 4
Upload dateJun 30,2011
Photo
Equipment Storage Pool side to the Fuel Reactor Well Spent Fuel Pool Gate Exchange Truck
pictured on Jun 29,2011
pictured on Jun 29,2011
pictured on Jun 29,2011
Fuel Pool Cooling and Filtering System Valve 20A
pictured on Jun 29,2011
Fuel Pool Cooling and Filtering System Valve 20B
pictured on Jun 29,2011
Category
■Search by status/measures
Status of the accident / Survey