Overview of the Multi-nuclide Removal Equipment (ALPS) at Fukushima Daiichi Nuclear Power Station
Upload dateMarch, 29, 2013
![](/library/130329_01/130329_02.jpg)
Photo
![](/library/130329_01/130329_01t.jpg)
Progress of building construction for the multi-nuclide removal equipment
Photo taken from the south side
Photo taken on March 27, 2013
![](/library/130329_01/130329_02t.jpg)
Photo taken from the northeast side
Photo taken on March 27, 2013
Photo taken on March 27, 2013
![](/library/130329_01/130329_03t.jpg)
Photo taken from the north side
Photo taken on March 27, 2013
Photo taken on March 27, 2013
![](/library/130329_01/130329_04t.jpg)
Progress of multi-nuclide removal equipment installation
Photo taken on September 16, 2012
Photo taken on September 16, 2012
![](/library/130329_01/130329_05t.jpg)
Adsorption tower (Treatment column)
Photo taken on March 27, 2013
Photo taken on March 27, 2013
![](/library/130329_01/130329_06t.jpg)
Control panels (1)
Photo taken on March 27, 2013
Photo taken on March 27, 2013
![](/library/130329_01/130329_07t.jpg)
Links
Category
■Search by status/measures
Others