Water Leakage observed around the flowmeter of Emergency Reactor Injection Pump (C) on the Hill at Fukushima Daiichi Nuclear Power Station
![](/library/120201_2/120201_03.jpg)
![](/library/120201_2/120201_03t.jpg)
Drainage at the side of the reactor injection facility on the hill (1)
pictured on Jan 29,2012
![](/library/120201_2/120201_04.jpg)
Drainage at the side of the reactor injection facility on the hill (2)
pictured on Jan 29,2012
![](/library/120201_2/120201_05.jpg)
Assembly ditch of the drainage
pictured on January 31, 2012
![](/library/120201_2/120201_06.jpg)
Mixing point of the facility-side drainage near the assembly ditch
pictured on Jan 31,2012
![](/library/120201_2/120201_07.jpg)
Mixing point of the montain-side drainage near the assembly
pictured on Jan 31,2012
![](/library/120201_2/120201_08.jpg)
Outlet of discharge canal of Units 5&6 at the ocean side
pictured on Jan 29,2012