Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: May 2012)

Upload dateJune 5, 2012
Photo
PCV entrance (Airlock for workers)
(Photo taken on May 10, 2012)
PCV entrance (Airlock for workers)
(Photo taken on April 17, 2012)
Visual inspection
(Photo taken on May 10, 2012)
Main steam isolation valve
(Photo taken on April 11, 2012)

Visual inspection

(Photo taken on May 10, 2012)

Pedestal (Base structure of RPV)
(Photo taken on May 10, 2012)
Rust on the vacuum breaker surface
(Photo taken on April 17, 2012)
Paint coming off on the main steam system pipe
(Photo taken on March 13, 2012)
Appearance of Turbine Buildings
(Photo taken on May 25, 2012)
The 2nd floor of Unit 1 T/B
(Photo taken on May 15, 2012)
The 2nd floor of Unit 2 T/B
(Photo taken on May 15, 2012)
The 2nd floor of Unit 3 T/B
(Photo taken on May 15, 2012)
The 2nd floor of Unit 4 T/B
(Photo taken on May 15, 2012)
Flooded condenser room in Unit 1 T/B basement
(Photo taken on March 20, 2011)
Unit 4 high-pressure turbine inspection
(Photo taken on December 7, 2011)
Unit 4 low-pressure turbine inspection
(Photo taken on December 2, 2011)