Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: March 2013)

Upload dateApril 3, 2013
Photo

●Permanent installation of the power panel (M/C 1HPCS) in Unit 1 Reactor Building Annex (March 1)

 

After function check
[Permanent installation completed on March 1, 2013] 

(Photo taken on March 12, 2013)

●Permanent installation of the emergency diesel generator (H) facilities in Unit 1 Reactor Building Annex (March 21)

 

Trial operation (control panel)
[Permanent installation completed on March 21, 2013]
(Photo taken on March 19, 2013)

Trial operation (generator)
[Permanent installation completed on March 21, 2013]
(Photo taken on March 21, 2013)
Trial operation (upper part of the diesel engine)
[Permanent installation completed on March 21, 2013]
(Photo taken on March 21, 2013)

●Permanent installation of the charger and battery of the DC power supply (H) in Unit 1 Reactor Building Annex (March 14)

 

After function check (charger panel)
[Permanent installation completed on March 12, 2013]
(Photo taken on April 1, 2013) 

After function check (battery)
[Permanent installation completed on March 14, 2013]
(Photo taken on March 14, 2013)

●Permanent installation of the electric motor of the residual heat removal system (A) in Unit 1 Reactor Building (March 15)

 

Trial operation
[Permanent installation completed on March 15, 2013]
(Photo taken on March 15, 2013) 

●Permanent installation of the electric motors of the residual heat removal system cooling systems (B and D) in Unit 1 Seawater Heat Exchanger Building (March 1)

 

Removal of temporary cable
(Photo taken on February 26, 2013) 

Switching to the permanent cable completed for the electric motor of the residual heat removal system cooling system (B)
[Permanent installation completed on March 1, 2013]
(Photo taken on March 14, 2013)

●Permanent installation of the electric motors of the residual heat removal system cooling seawater systems (B and D) in Unit 1 Seawater Heat Exchanger Building (March 4)

 

Before switching to the permanent cable
(Photo taken on February 25, 2013) 

●Permanent installation of the electric motor of the emergency diesel generator cooling system (B) in Unit 1 Seawater Heat Exchanger Building (March 1)

 

Before switching to the permanent cable
(Photo taken on February 25, 2013) 

Switching to the permanent cable completed for the electric motor of the emergency diesel generator cooling system (B)
[Permanent installation completed on March 1, 2013]
(Photo taken on April 1, 2013)

●Permanent installation of the electric motor of the high pressure reactor core spray system in Unit 1 Reactor Building (March 25)

 

Trial operation

[Permanent installation completed on March 25, 2013]
(Photo taken on March 25, 2013) 

●Permanent installation of the electric motor of the high pressure reactor core spray system component cooling system in Unit 1 Seawater Heat Exchanger Building (March 14)

 

Trial operation

[Permanent installation completed on March 14, 2013]
(Photo taken on March 14, 2013) 

●Permanent installation of the electric motor of the high pressure reactor core spray system component cooling seawater system in Unit 1 Seawater Heat Exchanger Building (March 18)

 

Trial operation
[Permanent installation completed on March 18, 2013]
(Photo taken on March 18, 2013) 

●Permanent installation of the electric motors of the reactor component cooling systems (A and B) in Unit 1 Seawater Heat Exchanger Building (March 8)

 

Switching to the permanent cable completed for the electric motor of the reactor component cooling system (A)
[Permanent installation completed on March 8, 2013]
(Photo taken on March 14, 2013) 

●Earthquake Training and Comprehensive Fire Fighting Training at Fukushima Daini Nuclear Power Station

 

Evacuation guidance training
(Photo taken on March 21, 2013) 

After a roll call
(Photo taken on March 21, 2013)
Fire fighting training
(Front: self defense fire-fighting team member, back: public fire-fighting team member)
(Photo taken on March 21, 2013)

●Installation of the Emergency Power Supply on the Hill (Gas Oil Tank on the Hill) and the Permanent Cable
◎Deployment of a gas oil tank on the hill and air-cooled gas turbine generator cars

 

Feeding oil to the gas oil tank on the hill (underground)
[Photo taken on March 27, 2013]

Air-cooled gas turbine generator car
[Photo taken on April 1, 2013]

 

 

 

Photo taken by Tokyo Electric Power Company 