The situation of accumulated water leakage at transfer line from the basement of turbine building of Unit 2 to Miscellaneous Solid Waste Volume Reduction Treatment Building�iHigh Temperature Incinerator Building)
Upload dateJan 21,2012

Photo

The situation of water leakage(1)
pictured on Jan 21,2012

The situation of water leakage(2)
pictured on Jan 21,2012
Category
■Search by status/measures
Mitigation of radioactive materials / Survey / Others
■Pickup
Troubles (in water processing system)