Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan(Monthly Report: June 2012)
Upload dateJuly 3, 2012

Photo

Seismometer installation (Unit 1 Reactor Building 2nd floor)
Photo taken on June 5, 2012
Photo taken on June 5, 2012

Air-cooled gas turbine power supply car and control vehicle
Photo taken on June 27, 2012
Photo taken on June 27, 2012

Training: Control vehicle
Photo taken on June 27, 2012
Photo taken on June 27, 2012

Training: Air-cooled gas turbine power supply car
Photo taken on June 27, 2012
Photo taken on June 27, 2012

Overhead traveling crane in the Reactor Building
(Unit 4 Reactor Building 6th floor)
Photo taken on June 15, 2012
(Unit 4 Reactor Building 6th floor)
Photo taken on June 15, 2012

Fuel handling machine (Unit 4 Reactor Building 6th floor)
Photo taken on June 15, 2012
Photo taken on June 15, 2012

Spent fuel storage rack (Unit 4 Reactor Building 6th floor)
Photo taken on June 18, 2012
Photo taken on June 18, 2012

Spent fuel pool (Unit 4 Reactor Building 6th floor)
Photo taken on June 15, 2012
Photo taken on June 15, 2012

Unit 4 Seawater Heat Exchanger Building 1st Floor after restoration
Photo taken on June 30, 2012
Photo taken on June 30, 2012

Power panel (P/C 4D-2)
Photo taken on June 18, 2012
Photo taken on June 18, 2012

Electric motor of the emergency diesel
generator system cooling (B system)
Photo taken on June 18, 2012
generator system cooling (B system)
Photo taken on June 18, 2012

Electric motor of the residual heat removal system cooling (C system)
Photo taken on June 7, 2012
Photo taken on June 7, 2012

Electric motor of the residual heat removal system seawater cooling (A system)
Photo taken on June 18, 2012
Photo taken on June 18, 2012

Air conditioning duct on the 1st floor of Unit 1 Seawater Heat Exchanger Building
Photo taken on March 16, 2011
Photo taken on March 16, 2011

Reactor component cooling system pump (B) on the
basement of Unit 4 Seawater Heat Exchanger Building
Photo taken on March 23, 2011
basement of Unit 4 Seawater Heat Exchanger Building
Photo taken on March 23, 2011

Unit 4 residual heat removal system cooling (C system)
on the 1st floor of Unit 4 Seawater Heat Exchanger Building
Photo taken on March 13, 2011
on the 1st floor of Unit 4 Seawater Heat Exchanger Building
Photo taken on March 13, 2011

Between Unit 3-4 Seawater Heat Exchanger
Buildings (Outside)
Photo taken on March 16, 2011
Buildings (Outside)
Photo taken on March 16, 2011

Between Unit 3-4 Seawater Heat Exchanger
Buildings (Outside) Debris removal completed
Photo taken on June 21, 2012
Buildings (Outside) Debris removal completed
Photo taken on June 21, 2012

Unit 1 power panel (P/C 1D-2) on the 1st floor of
Unit 1 Seawater Heat Exchanger Building
Photo taken on March 13, 2011
Unit 1 Seawater Heat Exchanger Building
Photo taken on March 13, 2011

Water-tight work implemented on the equipment hatch
Photo taken on March 23, 2012
Photo taken on March 23, 2012

Filling sealant in the gap between the equipment hatch and its lid
Photo taken on March 23, 2012
Photo taken by Tokyo Electric Power Company
Category
■Search by status/measures
Others