Investigation results of building flames after rubbles were removed from the upper part of the reactor building at Unit 3 of Fukushima Daiichi NPS
Image of the operational floor of the reactor building at Unit 3(1)
Photo taken on January 31, 2014
Image of the operational floor of the reactor building at Unit 3(2)
Photo taken on January 31, 2014
Image of the operational floor of the reactor building at Unit 3(3)
Photo taken on January 31, 2014
Whole operational floor of the reactor building at Unit 3
Photo taken on January 31, 2014
Shield plug of the reactor building at Unit 3 (before decontamination started)
Photo taken on October 10, 2013
Shield plug of the reactor building at Unit 3 (after small rubbles were removed)
Photo taken on January 30, 2014
Image of the inside of the equipment hatch at Unit 3 (Pool wall)
Photo taken on July 12, 2012
Photo taken by Tokyo Electric Power Company
Investigation results of building flames after rubbles were removed from the upper part of the reactor building at Unit 3 of Fukushima Daiichi NPS(23:41)
Play Video / Download(203MB)
Video taken on January 31, 2014
Category
■Search by status/measures
Survey