(A video was added on December 13)Results of Investigation into Building Frames around Unit 1 Reactor Building Equipment Hatch at Fukushima Daiichi NPS
Upload dateDecember 6, 2013
Photo
2nd floor equipment hatch walls in the west (C3)
Photo taken on December 4, 2013
Photo taken by Tokyo Electric Power Company
Video
Results of Investigation into Building Frames around Unit 1 Reactor Building Equipment Hatch at Fukushima Daiichi NPS
Play Video (7:14) / Download (96.0MB)
Video taken on December 4-5, 2013
Video taken by Tokyo Electric Power Company
* A video was added on December 13, 2013.
Links
Category
■Search by status/measures
Survey