Inspection of the equipment hatch of PCV in Unit 3 of Fukushima Daiichi Nuclear Power Station
Upload date2012.4.19
Photo
Date: November, 2011
Date: April 19, 2012
Floor surface where the water leakage could have occurred
Date: April 19, 2012
Links
<Reference>
(PDF 85.2KB)
Category
■Search by status/measures
Survey